One of the more recent regional infrastructure development projects completed in late 2020. Approximately 10,000m2 of grouted rock pitching to kerb chutes and ungrouted rock protection to bridge structure were installed over a 5 month programme which incorporated a number of mobe/demobes to allow the head contractor to meet their critical path deadlines. We think the end product looks great from the air too with these awesome drone images.